EVGA

Hot!General timeframe? SU to 11G-P4-6393-KR (1080 Ti SC Black)

Author
jkinney110
Superclocked Member
  • Total Posts : 219
  • Reward points : 0
  • Joined: 2009/02/02 16:01:09
  • Location: Noblesville, Indiana
  • Status: online
  • Ribbons : 1
2017/06/05 05:24:39 (permalink)
Greetings EVGA forum dwellers.
Long time no post. Longer time no step-ups for me.
 
I landed a GTX 1080 Founder's Edition that I decided to upgrade when I saw the 1080 Ti SC Black Ed. was available for step-up, and for not much more than what I invested in my 1080 in the first place. I've been stuck at Processing since 05-23-2017 (just short of two weeks) and thought I could create a feeler thread to find out what an average wait time has been for the community. Anyone?
 
 
FWIW - I am excited. Not impatient. I scored a cheap $120 Polaris card to use in my downtime for the Step-Up and everything  

I'm a fanboy. Of the PC Master Race.
Day-1: Maxwell, Polaris, Ryzen
#1

5 Replies Related Threads

    Nozler
    FTW Member
    • Total Posts : 1360
    • Reward points : 0
    • Joined: 2009/10/28 10:51:49
    • Location: Ottertail county,Minnesota,USA
    • Status: offline
    • Ribbons : 1
    Re: General timeframe? SU to 11G-P4-6393-KR (1080 Ti SC Black) 2017/06/05 11:07:13 (permalink)
    Heres a thread about this exact subject >>>https://forums.evga.com/1...p-Thread-m2668363.aspx

    heatware
     
    #2
    Squall_Rinoa86
    FTW Member
    • Total Posts : 1506
    • Reward points : 0
    • Joined: 2010/07/26 14:09:48
    • Location: The Empire State -> Hyde Park
    • Status: offline
    • Ribbons : 3
    Re: General timeframe? SU to 11G-P4-6393-KR (1080 Ti SC Black) 2017/07/04 21:08:08 (permalink)
    Like.. 2 months turn around if not more... I started mine May 17th, still no movement.




    PSU: EVGA SuperNOVA 1300 G2
    My Affiliate Code: AN1FW0VMG6
    #3
    hmortimer
    New Member
    • Total Posts : 11
    • Reward points : 0
    • Joined: 2005/10/29 11:18:13
    • Status: offline
    • Ribbons : 0
    Re: General timeframe? SU to 11G-P4-6393-KR (1080 Ti SC Black) 2017/07/13 11:04:45 (permalink)
    I started mine on 5/22. This is turning into a seriously long wait.
    #4
    huf757
    FTW Member
    • Total Posts : 1067
    • Reward points : 0
    • Joined: 2010/08/20 00:29:34
    • Location: Illinois
    • Status: online
    • Ribbons : 1
    Re: General timeframe? SU to 11G-P4-6393-KR (1080 Ti SC Black) 2017/07/15 10:55:50 (permalink)
    I started mine on 5/18 and just sent in payment and will be shipping my card out on Monday. 
     
     
    hmortimer
    I started mine on 5/22. This is turning into a seriously long wait.

     
    Looks like your wait is coming to an end
    post edited by huf757 - 2017/07/15 10:58:03

    7700k 4.9ghz @ 1.37v De-Lidded
    Noctua NH-D15
    16 gb Gskill 2400
    EVGA GTX 1070 ACX 3.0 SC -> Stepping up to 1080TI
    NVME hard drives 2600 read / 1500 Write
    Asrock z270 killer sli mobo
    AOC 34 inch Gsync 100 MHz 3440x1440 Monitor
    EVGA 600 watt semi-modular PSU
    Corsair Carbide 300R case w/max fans
    NZXT 5 fan controller
    #5
    hmortimer
    New Member
    • Total Posts : 11
    • Reward points : 0
    • Joined: 2005/10/29 11:18:13
    • Status: offline
    • Ribbons : 0
    Re: General timeframe? SU to 11G-P4-6393-KR (1080 Ti SC Black) 2017/07/17 16:24:24 (permalink)
    Just sent in payment today! It says "verifying transaction" right now. Hopefully I get the next email tomorrow and can send my card in.
     
    Thanks for the update.
    #6
    Jump to:
  • Back to Mobile