EVGA

Intel Meteor Lake Delayed Until End of 2023, Will Have Knock-On Effects for TSMC

Author
rjohnson11
EVGA Forum Moderator
  • Total Posts : 84881
  • Reward points : 0
  • Joined: 2004/10/05 12:44:35
  • Location: Netherlands
  • Status: offline
  • Ribbons : 86
2022/08/04 06:32:25 (permalink)
https://www.techpowerup.com/297482/intel-meteor-lake-reportedly-delayed-until-end-of-2023-will-have-knock-on-effects-for-tsmc
 
Based on a report by TrendForce, Intel has yet again had to push back its upcoming Meteor Lake CPUs and it now appears that Intel will only be launching Meteor Lake towards the end of 2023. It's unclear why there has been yet another delay, but Intel is said to have cancelled most of its orders with TSMC for the 3 nm tGPU that Intel will have made at TSMC, for 2023. The knock-on effect of this, is that TSMC is said to be slowing down its production line expansion towards 3 nm, as the company is now unsure if it'll be able to fill its order books for all of 2023. TSMC's main customer for the 3 nm node is still going to be Apple, but with the loss of what is likely to be around six months worth of production from Intel, TSMC is said to be considering cutting its CapEx for 2023.

TSMC's other customers, such as AMD, MediaTek and Qualcomm aren't planning on moving to 3 nm until 2024, so unless there's a change in plans from either of these companies, or increased demand from Apple, TSMC is said to hit the breaks when it comes to starting up new, cutting edge production lines next year. TSMC is also likely to see reduced revenues during 2023 due to Intel's change of plans, although it's too early to make any assumptions. TrendForce also suggests that Intel might still use TSMC's 3 nm node as a backup plan, if Intel would fail to execute on moving to the Intel 4 process, but considering how complex it is to move a design between different foundry processes, this seems unlikely.
 
Personally I think AMD should have a rethink of this situation and go to 3nm ahead of Intel. 

AMD Ryzen 9 7950X,  Corsair Mp700 Pro M.2, 64GB Corsair Dominator Titanium DDR5  X670E Steel Legend, MSI RTX 4090 Associate Code: H5U80QBH6BH0AXF. I am NOT an employee of EVGA

#1

2 Replies Related Threads

    B0baganoosh
    CLASSIFIED Member
    • Total Posts : 2468
    • Reward points : 0
    • Joined: 2009/08/04 04:27:18
    • Status: online
    • Ribbons : 42
    Re: Intel Meteor Lake Delayed Until End of 2023, Will Have Knock-On Effects for TSMC 2022/08/04 06:43:13 (permalink)
    Wait, Intel is delaying the first gen on a brand new node? Can't be.

    6Q6CPFHPBPCU691 is a discount code anyone can use.
     
    i9 13900k - EVGA Z690 Classy - Nvidia RTX 4090 FE - G.Skill 64GB DDR5-6000CL30  - WD SN850 2TB NVMe Gen4 - Be Quiet! Straight Power 12 1200W - Be Quiet! Dark Base 900 Pro. MO-RA3 420 Pro. Dark Palimpsest MODS RIGS post for build notes.
    #2
    kougar
    CLASSIFIED Member
    • Total Posts : 3034
    • Reward points : 0
    • Joined: 2006/05/08 10:11:19
    • Status: offline
    • Ribbons : 22
    Re: Intel Meteor Lake Delayed Until End of 2023, Will Have Knock-On Effects for TSMC 2022/08/04 18:01:43 (permalink)
    I'm sure Intel will pay penalties for any cancellations or reduced orders, leading-edge nodes are long-term commitments.
     
    Intel itself seems to be having a great deal of trouble bringing up anything to sell of late, other than it's own assets.  


    Have water, will cool. 
    #3
    Jump to:
  • Back to Mobile