I'm ramping up production. Letting my Kara rig do most of the folding and than I'm letting the Crystal rig do all of the crunching. This should allow double crunch time and I should be able to get my first badge soon. Currently I'm aiming for the energy project, but may get the aids badge first since I've done the most time on those projects.