Re: PG Cat Day Challenge: 5 day PRS (Primorial Search) from 8/8/24 08:08 UTC to 8/13 08:08
2024/08/13 07:59:48
(permalink)
From the challenge thread.
Thank you everyone to coming to our first PRS challenge!
Challenge: International Cat Day
App: 35 (Primorial)
(As of 2024-08-13 08:09:11 UTC)
148861 tasks have been sent out. [CPU/GPU/anonymous_platform: 148594 (100%) / 0 (0%) / 267 (0%)]
Of those tasks that have been sent out:
28045 (19%) were aborted. [27961 (19%) / 0 (0%) / 84 (0%)]
160 (0%) came back with some kind of an error. [160 (0%) / 0 (0%) / 0 (0%)]
105343 (71%) have returned a successful result. [105213 (71%) / 0 (0%) / 130 (0%)]
15286 (10%) are still in progress. [15233 (10%) / 0 (0%) / 53 (0%)]
Of the tasks that have been returned successfully:
12295 (12%) are pending validation. [12286 (12%) / 0 (0%) / 9 (0%)]
93048 (88%) have been successfully validated. [92927 (88%) / 0 (0%) / 121 (0%)]
6 (0%) were invalid. [6 (0%) / 0 (0%) / 0 (0%)]
0 (0%) are inconclusive. [0 (0%) / 0 (0%) / 0 (0%)]
The current leading edge (i.e., latest work unit for which work has actually been sent out to a host) is n=6533707. The leading edge was at n=5390719 at the beginning of the challenge. Since the challenge started, the leading edge has advanced 21.20% as much as it had prior to the challenge!
At the Conclusion of the Challenge
When the challenge completes, we would prefer users "moving on" to finish those tasks they have downloaded, if not then please ABORT the WU's (and then UPDATE the PrimeGrid project) instead of DETACHING, RESETTING, or PAUSING.
ABORTING WU's allows them to be recycled immediately; thus a much faster "clean up" to the end of a Challenge. DETACHING, RESETTING, and PAUSING WU's causes them to remain in limbo until they EXPIRE. Therefore, we must wait until WU's expire to send them out to be completed.
Life is too short to carry a cheap pocket knife