EVGA

Intel Processors Selected to Power Next-Gen DOE Supercomputers

Author
rjohnson11
EVGA Forum Moderator
  • Total Posts : 102260
  • Reward points : 0
  • Joined: 2004/10/05 12:44:35
  • Location: Netherlands
  • Status: online
  • Ribbons : 84
2021/09/21 23:46:19 (permalink)
https://www.techpowerup.com/286982/intel-processors-selected-to-power-next-gen-doe-supercomputers
 
The U.S. Department of Energy's (DOE's) National Nuclear Security Administration (NNSA) selected next-generation Intel Xeon Scalable processors (code-named "Sapphire Rapids") to power the supercomputers used within NNSA's Life Extension Program for mission-critical efforts in stockpile stewardship. The NNSA's Lawrence Livermore National Laboratory awarded a subcontract to Dell Technologies to supply the Intel-powered computing systems that will be deployed at the NNSA's Tri-Labs (Lawrence Livermore National Laboratory, Los Alamos National Laboratory and Sandia National Laboratories).

Today's news supports the NNSA's Advanced Simulation and Computing (ASC) program operated at the NNSA's Tri-Labs. The Commodity Technology Systems contract (CTS-2) awarded today will enable these three national laboratories to build more powerful, energy-efficient computing systems that will focus on performing extensive modeling and simulation capabilities in support of NNSA's stockpile stewardship program.
 
Initial system deliveries are scheduled to begin in mid-2022 and continue through 2025. The systems will replace the current ASC commodity systems that were sourced by the 2015 CTS-1 contract and are nearing retirement.

The computing systems being built through CTS-2 will incorporate next-generation Intel Xeon Scalable processors with next-generation Dell EMC PowerEdge servers. The Xeon Scalable processors are optimized for high-performance computing workloads, with built-in acceleration for modeling and simulation, artificial intelligence and high-performance data analytics.
 
So at last Intel secured a major contract win. 

AMD Ryzen 9 7950X,  Corsair Mp700 Pro M.2, 64GB Corsair Dominator Titanium DDR5  X670E Steel Legend, MSI RTX 4090 Associate Code: H5U80QBH6BH0AXF. I am NOT an employee of EVGA

#1

3 Replies Related Threads

    Flint 1760
    Omnipotent Enthusiast
    • Total Posts : 8295
    • Reward points : 0
    • Joined: 2009/04/26 15:44:26
    • Status: offline
    • Ribbons : 45
    Re: Intel Processors Selected to Power Next-Gen DOE Supercomputers 2021/09/22 07:18:30 (permalink)
    They also have the Aurora Exascale computer contract at the Argonne National Labs which is the follow on to Polaris for which AMD had the contract.


    #2
    Cool GTX
    EVGA Forum Moderator
    • Total Posts : 30975
    • Reward points : 0
    • Joined: 2010/12/12 14:22:25
    • Location: Folding for the Greater Good
    • Status: offline
    • Ribbons : 122
    Re: Intel Processors Selected to Power Next-Gen DOE Supercomputers 2021/09/22 13:33:55 (permalink)
    bidding for US government contracts is like making sausage
     
    congrats Intel

    Learn your way around the EVGA Forums, Rules & limits on new accounts Ultimate Self-Starter Thread For New Members

    I am a Volunteer Moderator - not an EVGA employee

    https://foldingathome.org -->become a citizen scientist and contribute your compute power to help fight global health threats

    RTX Project EVGA X99 FTWK Nibbler EVGA X99 Classified EVGA 3080Ti FTW3 Ultra


    #3
    stebru94
    New Member
    • Total Posts : 100
    • Reward points : 0
    • Joined: 2021/09/29 13:37:08
    • Status: offline
    • Ribbons : 0
    Re: Intel Processors Selected to Power Next-Gen DOE Supercomputers 2021/09/30 09:18:08 (permalink)
    wow, amazing Intel, congrats!
    #4
    Jump to:
  • Back to Mobile