EVGA

Does moving to Step 2 mean there was stock?

Author
terry2776
New Member
  • Total Posts : 63
  • Reward points : 0
  • Joined: 2008/02/29 17:31:13
  • Status: offline
  • Ribbons : 0
2017/03/10 13:32:57 (permalink)
Does moving to Step 2 mean there was stock? Wondering what step is the longest besides the shipping part?

Intel i9 9900K @ 5GHz
Corsair H110i AIO Liquid Cooler
Gigabyte Z390 Aorus Master
32GB (4x8GB) GSkill TridentZ RGB @ 3600MHz 16-19-19-39 1.35v
Samsung 960 Pro 1TB NVME SSD
eVGA RTX 3090 FTW3 Ultra 24GB
1000W Silverstone Strider Plus ST1000-P Power Supply
Phanteks Enthoo Primo Case w/ 7 x 140MM Fans
Acer Predator XB241YU Monitor 1440p 144Hz
Windows 10 Professional 64-Bit
#1

1 Reply Related Threads

    terry2776
    New Member
    • Total Posts : 63
    • Reward points : 0
    • Joined: 2008/02/29 17:31:13
    • Status: offline
    • Ribbons : 0
    Re: Does moving to Step 2 mean there was stock? 2017/03/10 15:55:54 (permalink)
    I just paid my step up in Step 3

    Intel i9 9900K @ 5GHz
    Corsair H110i AIO Liquid Cooler
    Gigabyte Z390 Aorus Master
    32GB (4x8GB) GSkill TridentZ RGB @ 3600MHz 16-19-19-39 1.35v
    Samsung 960 Pro 1TB NVME SSD
    eVGA RTX 3090 FTW3 Ultra 24GB
    1000W Silverstone Strider Plus ST1000-P Power Supply
    Phanteks Enthoo Primo Case w/ 7 x 140MM Fans
    Acer Predator XB241YU Monitor 1440p 144Hz
    Windows 10 Professional 64-Bit
    #2
    Jump to:
  • Back to Mobile