EVGA

Possible Posting System to get an ETA for processing???

Author
RedJamaX
New Member
  • Total Posts : 3
  • Reward points : 0
  • Joined: 2015/05/06 18:56:35
  • Status: offline
  • Ribbons : 0
2015/06/22 09:07:41 (permalink)
Just wondering if it would be ok to start a thread where people can get an idea of where they are in the step up process??
For example...  Running a thread with a title like "06G-P4-4991-KR Step-Up Processing Queue #"... where people could simply post something like "My Step-up ID # ******* was just processed"
 
We all have a unique Step-Up queue # based on first-come first serve.  We are NOT all going for the same card, so each thread would have to be for each model video card available in the step-up program.  Yes.. I know that it would not be a direct indicator of an ETA, but it would be much better than the "nothing" we get right now.
 
I understand that if you have step-up id #***1099, going for model 4991, and then ID# ***1098 gets process for model 4993, that doesn't mean anything about the ETA for your card.  That is why we would need separate threads for each possible step-up model target.
 
The biggest question is... do the unique Step-Up ID #'s hold any value other than just being a queue #?  Would this cause a problem with your request by posting your Step-Up Queue#?   I do not recall seeing anything from EVGA that says "do not give this number to anybody"...
 
Thoughts?
#1

3 Replies Related Threads

    dlb134
    iCX Member
    • Total Posts : 432
    • Reward points : 0
    • Joined: 2010/02/01 12:17:44
    • Status: offline
    • Ribbons : 0
    Re: Possible Posting System to get an ETA for processing??? 2015/06/22 12:21:18 (permalink)
    It would work better if you just posted the time you received the step-up confirmation email after you submitted.

    #2
    turbolag
    New Member
    • Total Posts : 10
    • Reward points : 0
    • Joined: 2015/05/15 17:56:41
    • Status: offline
    • Ribbons : 0
    Re: Possible Posting System to get an ETA for processing??? 2015/06/22 15:48:48 (permalink)
    I requested my step up on June 1st I just got my approval today June 22nd
    #3
    RedJamaX
    New Member
    • Total Posts : 3
    • Reward points : 0
    • Joined: 2015/05/06 18:56:35
    • Status: offline
    • Ribbons : 0
    Re: Possible Posting System to get an ETA for processing??? 2015/06/29 10:07:08 (permalink)
    Just got my notification of moving into "Step 2" , proof of purchase verification.
     
    FYI... I signed up for the Step-up program on June 2nd... it is now June 29th. 
    Stepping up from 970 FTW  (04G-P4-2978-KR) , to the 980 Ti ACX  (06G-P4-4991-KR)
     
    I would have gotten the Super-Clocked model, but the one listed is the ONLY 980Ti I was allowed to choose when stepping up from the 970 FTW...  I really figured the 970 FTW would have allowed at least the SC model 980Ti...  oh well...  It will overclock nicely I am sure.
    #4
    Jump to:
  • Back to Mobile